Value Enhancement throughSynchronization of R&D and Manufacturing
Executive Competence
- Planning and transforming programs for optimizing all functions of a site or a manufacturing network.
- R&D and manufacturing asset effectiveness address the key performance drivers and ensure that the sites are aligned to deliver sustainable improvements.
Best Practice Approaches (abstract)
- CoGS optimization (e.g. labour, machinery, maintenance)
- Design-for-manufacture/production
- Factory planning and optimization of plant utilization
- Missing parts optimization, bottleneck and variants management
Client Impact / Key Facts
- Decreasing unit cost rates by > 18%.
- Achieved productivity improvements by e.g. >21% in manufacturing and reduced build cycles by 32%
- Improvement of development times significantly by 1/3 of total and in parallel, reduced total unit cost by 14%.
- Elimination of capability overlaps and reduction of manufacturing costs by up to 23%.
Meet our Expert
Michael Bremicker
Partner BrainNet Engineers GmbH and Practice Head SCM – Develop and Make
This e-mail address is being protected from spambots. You need JavaScript enabled to view it.